Access roads, windmill paths and crane set-up place using GeoCrete®
For wind energy producers, the Enercon project is a good example of the multi-purpose construction of roads and crane installation sites. Solution:
The area was characterized by a peat package of 3 meters thick with a clay package of 0.5-1.0 meters. Calculated with BISAR 3.0 is that with a stiffness modulus of 10,000 MpA and a minimum compressive strength of 9 Mpa a stabilization package of 90 cm was sufficient to float on the peat package.
The requirement was a load capacity of 185KN.m2 In addition to drill cores, fall-deflexion measurements were performed. The lifting operations have been successfully carried out without problems. A comprehensive report is available.
Do you have a project or want to know more about the properties of GeoCrete®, then we invite you to contact us.